Liner Bearing the PTsR.7.102/146 Cementing Hanger Successfully Run in Well 3516 of Pad 138 of the Prirazlomnoye Field of RN-Yuganskneftegaz LLC

Пред.
November 2024
MON TUE WED THU FRI SAT SUN
28 29 30 31 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 1
Liner Bearing the PTsR.7.102/146 Cementing Hanger Successfully Run in Well 3516 of Pad 138 of the Prirazlomnoye Field of RN-Yuganskneftegaz LLC
TSS LLC's and Nefneyugansk SBU's specialists have successfully run a liner bearing MSZ BULAT LLC's PTsR.7.102/146 Cementing Hanger in Well 3516 of Pad 138 of the Prirazlomnoye Field (RN-Yuganskneftegaz LLC). The work was done as part of well revamping by the sidetracking method. The liner fitted with frac ball sleeves has been run in the hole and collar cementing was performed.

The use of this hanger makes it possible to perform disconnection before cementing is done, the fact of disconnection being confirmed by movement, rise of the setting tool by more than 5 m, which prevents cementing preparation mistakes and well construction accidents when such assemblies are used.
Back to the list
of news
Next
news