News

Пред.
October 2025
MON TUE WED THU FRI SAT SUN
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2
News archive:
"Made in Russia" conformity certificate of the Russian Export Center and GOST R ISO 29001-2023 conformity certificate of AJA Registrars Management Systems Certification Authority were presented to TSS LLC.
TSS's South China sea shelf project completed successfully
TAML-3 Multibore Well Constructed to Enable Selective Access and MSHF in Both Boreholes
177.8 mm Casing String Secured with the PMK.1.178.209.01 Wire Cord Packer in the Urengoiskoye OGCF of RusGazBureniye LLC
System for Intelligent Monitoring at a Depth of 5,300 m for the Kharbeiskoye Field
Liner Bearing the PTsR.7.102/146 Cementing Hanger Successfully Run in Well 3516 of Pad 138 of the Prirazlomnoye Field of RN-Yuganskneftegaz LLC
177.8х139.7 mm Combined String Bearing a 25-Stage MSFHF Assembly Successfully Run in the Priobskoye Field of RN-Yuganskneftegaz LLC
Second TSS Service Engineer Training Held in Nizhnevartovsk from the 13th to the 16th February, 2024
METTLABS R&D Centre Opened
Liner Reaming by WWO Team and with Use of CT Training Held in Nizhnevartovsk from the 23th to the 25th of January, 2024
Successful RIH of a 324 mm Casing String under Complex Geological and Drilling Conditions of the Astrakhanskoye Field, Using the BULAT-324.D Hydraulic Reaming Shoe and Casing String Running System
Multibore Well Completion Training Was Held in Sergiyev Posad from the 07th to the 10th of November, 2023